TATE MANAGEMENT

Owner Representation, Construction Management, Heavy & Civil Design

Park High School, Livingston, Montana
San Francisco International, San Francisco, California
Shooting Star, Park City, Utah
Heavy Civil, Big Sky, Montana

Owner Representation

Active Projects

Belgrade High School Renovation & Expansion

  • Manage all aspects of design and construction for a 131,144 SF facility. This project will be executed over several phases while occupied by students and faculty.

Central Valley Fire District

  • Assist in selecting the Architectural and Contracting team. Manage all aspects of design and construction for a new resident Station #1 to be located at Bozeman Yellowstone International Airport.

Yellowstone Theological Institute

  • Manage all aspects of planning, design and construction for the The Yellowstone Center for Faith, Adventure, and the Arts. This 40,000 SF building includes a 400-seat sanctuary, a community cafe, and an academic wing including a library, faculty offices, and classrooms.

HRDC

  • Manage all aspects of construction for the Big Sky Villas apartment renovation, which includes a complete interior and exterior renovation of twenty-four occupied units in a compressed schedule.

Montana State University

  • Coordinate work on campus with Verizon, AT&T, and Sprint contractors.

Completed Projects

Big Sky School District

  • Manage all aspects of design and construction for a new Learning Commons and Library.

Big Springs Ditch Water Conservation Project, Townsend, MT 2015–16

  • Manage all aspects of design and construction for a $1 million Water Conservation Project funded by a Bureau of Reclamation WaterSMART Grant, and multiple grants from the Department of Natural Resources and Conservation. This project includes piping 3,050 feet of open ditch adjacent to the Missouri River and Montana Rail Link with 54” HDPE Pipe.

Monforton School, Bozeman, MT 2010–17

  • Manage all aspects of design and construction for mechanical, electrical, and fire suppression upgrades and new construction for school expansion.
  • TM was invited back by the Monforton School District to help develop a successful bond strategy, manage the design process, and execute the project during the construction phase.
  • Manage all aspects of planning, design, and construction of a new $7 million middle school. Completed July 2017.

Montana State University, Bozeman, MT 2011–2017

  • Feasibility Study and implementation of all aspects of procurement and construction of additional research and classroom space needed for the Engineering and Ecology Departments.
  • Campus-wide Catastrophic Hail Damage Repair.
  • Leon Johnson Hall Thermal Biology Institute (TBI) remodel. Managed NSF-funded project to renovate the 70s-era Thermal Biology Institute’s (TBI) research labs, completely updated to meet the demands of modern research technologies.
  • Leon Johnson Hall Energy Upgrade Project. Coordinated a complicated scope of work within an eight story, fully-occupied research facility, including asbetos abatement, HVAC replacement, and new energy plant.
  • Linfield Hall Facility Upgrades. Extensive renovations and upgrades including HVAC and complete electric service.
  • Miller Dining Hall Renovation: TM was asked to assume management responsibilities with only four months remaining before the scheduled August 2015 grand opening of this $15 million renovation of this 60’s-era building. This complete renovation included structural, mechanical, and electrical upgrades, and extensive detailed work with 11 food vendors.

Ophir Elementary School, Big Sky, MT 2014–15

  • Manage all aspects of the design and construction of this new K-4 elementary school, the response of the Big Sky community to growth and increased enrollment, funded by a $10,100,000 bond passed by voters.

Park High School, Livingston, MT 2010–12

  • Manage all aspects of design and construction for a $15 million modernization and expansion.

Sourdough Fire Department, Bozeman, MT 2014

  • Manage all aspects of design and construction of Sourdough Fire Station, planned and coordinated to keep the fire station fully operational during construction.

The Club at Spanish Peaks, Big Sky, MT 2005–10

  • Ski Lodge.
  • The Pinnacle Restaurant.
  • Geotechnical.

Construction Management

Commercial Construction

Shooting Star, Deer Valley, UT

  • Custom lodge for East West Partners; $15 million.

Arrowleaf, Deer Valley, UT

  • Custom lodge for East West Partners; $32 million.

The Club at Spanish Peaks, Big Sky, MT

  • Golf Clubhouse; $15 million.

Tenfold, Salt Lake City, UT

  • Corporate headquarters facility; $20 million.

Grand America, Salt Lake City, UT

  • Five-star, 776-room luxury high-rise hotel; $250 million.

San Francisco International Airport

  • $75 million.

Heavy Civil

Harbor Drive Airport Project

  • San Diego, CA.

San Joaquin Transportation Corridor

  • Irvine, CA.

Local Streets Reconstruction, Phase VI West Capital Hills

  • Salt Lake City, UT.

Other Projects

Union Pacific Railroad

  • Design of retaining walls.

UT Department of Transportation

  • Inspection for bridge rehabilitation, box culverts, sign structures, and roadway design.

Montana Department of Transportation

  • Bridge and roadway design.

National Forest Service

  • Bridge and roadway design.

Design

Gallatin County: Swamp Bridge Replacement

  • Gallatin County, MT.

Yellowstone Club: Phase 3 — 3 Ski-Over Bridge

  • Big Sky, MT.

The Club at Spanish Peaks: Settlement Drive Bridges

  • Big Sky, MT.

New Mexico State Highway and Transportation Department: US70 Hondo Valley Design/Build

  • Ruidoso Downs to Riverside, New Mexico.

Route 3 North Transportation Improvement: Design-Build Project

  • Boston, MA.

10600 South Over Jordan River

  • South Jordan, UT.

I-25 Over Candelaria Road

  • Albuquerque, NM.

Projects Localization

(not all projects included)

"...we contracted with them for project management services on a complete mechanical retrofit of Leon Johnson Hall, an eight story laboratory building, in addition to a separate but concurrent project to remodel the sixth floor of the same building. Cristie Tate has done an excellent job managing these two projects."